MAIN PUBLICATION :



Home � TECHNOLOGY � Offshore � Wind farm design offshore � Installation

Installation


The installation of the wind turbines and their support structures is a major factor in the design of offshore wind farms, with the specific challenge of having to perform multiple repeated operations in difficult offshore locations.  As well as being a significant contributor to the capital cost, the installation process may drive the selection of support structure technology.

 

Figure 5.12 Heavy lift (shear-leg) vessel

 

 

Source: Scaldis


The substation installation is also a major operation, albeit a single one, unlike the wind turbine and wind turbine foundation installation, and therefore much more conventional in the offshore industry.  A large crane vessel is likely to be required – either a shear-leg crane or other heavy lift unit.  Alternatively, self-installing substation designs may find an increasing role in the future.


Cable installation is a significant industry sector, with specialist design and planning, and installation vessels and equipment.  The design and planning of the cable installation is an early activity, covering:


  • Identification of hazards to cables;
  • Site investigation to identify seabed properties (geophysical survey, vibrocore sampling, cone penetrometer tests, boreholes);
  • Development of burial protection indices;
  • Scour protection;
  • Cable route selection;
  • Cable transport; and
  • Vessel and equipment selection.
<< Electrical system
  Acknowledgements | Sitemap | Partners | Disclaimer | Contact

coordinated by

EWEA

supported by

Intelligent Energy Europ

The sole responsibility for the content of this webpage lies with the authors. It does not necessarily reflect the opinion of the European Communities. The European Commission is not responsible for any use that maybe made of the information contained therein.