Wind farm costs are largely determined by two factors: the complexity of the site and the likely extreme loads. The site may be considered complex if the ground conditions are difficult – hard rock, or very wet or boggy ground, for example – or if access is a problem. A very windy site with high extreme loads will result in a more expensive civil infrastructure as well as a higher specification for the turbines.
The cost of the grid connection may also be important. Grid connection costs are affected by:
- Distance to a suitable network connection point
- The voltage level of the existing network
- The network operator’s principles for charging for connections and for the use of the electricity system
Costs are covered in Part III: Economics of Wind.
<< Construction issues | Commissioning, operation and maintenance >> |
Sitemap | Partners | Disclaimer | Contact | ||
coordinated by |
supported by |
The sole responsibility for the content of this webpage lies with the authors. It does not necessarily reflect the opinion of the European Communities. The European Commission is not responsible for any use that maybe made of the information contained therein. |
ArtWhere offers you services in Content Management System, CMS, Design, Web positioning and Hosting . © ArtWhere s.a.Neo-CMS ver 1.703 © ArtWhere s.a. | ||